.

Tuesday 22 January 2019

Frequent Shopper Program

Kudler Fine Foods (KFF) is a local upscale specialty nutrition store that is committed to providing customers with the finest selection of specialty foods. In addition, KFF would like to put in their customers for their loyalty by incorporating a betray shopper class. KFF is planning on develop a system that tracks customer purchases and awards loyalty points for redemption. The system ordain serve KFF in satisfying their most valued customers.Smith Systems Consulting Firm has been contracted for the increment of the system. Smith Systems Consulting has been serving clients since 1994 with high value web and business screening services. In this proposal, Smith Systems consulting will propose two alternative methods for end the frequent shopper covering. The utilitys and disadvantages for severally method and how the firm would conduct scrutiny for each growth method will be discussed.Regardless of which method is used, most parcel figure out mannikins, follow a sim ilar set of phases and activities. The difference in the midst of models is the order and frequency of the phases. The specific separate of the softw atomic number 18 procedure ar presented below 1. Inception Softw be product is created and fastend.2. Planning Resources, schedule, and cost are determined. 3. Requirements Analysis Specify what the application must do. 4. Design Specify the parts and how they fit 5. Implementation Write the code 6. Testing Execute the application with gossip assay data 7. Maintenance Repair defects and add mental ability (TechTarget, 2014)The first model that will be proposed is the waterfall process. The waterfall process is the oldest software process model and despite its weaknesses, it is still in general use today. The waterfall process requires following the phases in a nonparallel order where the output for angiotensin converting enzyme phase is used as the input for the next. The next phase in the process is not started until the previous one has been accomplished, although a small overlap between phases is accepted. Two advantages and disadvantages of apply this model relative to the frequent shopper course of study will be discussed.The first advantage is the practicality of the process. We have been using this process for many years and have a great deal of experience with it. All individuals involved have and reason of the process and its execution. The second advantage is the process is simple and simplified to use. The criteria of each phase are set and completed sequentially. The order of execution is easy for everyone to comprehend. There is no question on what reads to be completed before the next phase can set about.The first disadvantage is that requirements need to be known up front. KFF currently has a broad plod of requirements and every detail is not known. As the confinement progresses, more detail may become known which could cause the project to be halt and re-imagined. The second disadvantage is that in that respect is no feedback of the system by stakeholders until subsequently the testing phase. KFF has no way of knowing if the program meets their requirements because the waterfall process does not facilitate intermediate versions.The second method that will be proposed is the flying methodological analysis. The immediate methodology proposes alternatives to traditional project management. Agile development focuses on keeping code simple, testing often, and delivering functional bits of the application as soon as they are prompt (TechTarget, 2014). One goal of agile development is to build upon small-client-approved parts as the project progresses, as irrelevant to delivering one large application at the end of the project.One advantage to using agile methodology for the frequent shopper application is the ability to respond to ever-changing requirements. KFF may decide to change the requirements of the project, which can easily be handled usi ng the flexibility of the agile methodology. A second advantage is the face-to-face parley and continues input from customer representatives making sure that at that place is no stroke (Buzzle, 2013). The result is exactly what the customer has required.The first disadvantage of the agile methodology is the possibility that the project can be taken off track. KFF is not one hundred percent clear on the final import that they want therefore, the project has the potential to get off track because requirements are constantly changing. Another disadvantage is that it is difficult to assess the effort needed to complete this project at the beginning of the software development invigoration cycle. Since KFF is not specific on the requirements for the project, we cannot plan how much time or the amount of resources we will need to complete the project.Regardless of the method that is used for the frequent shopper application, testing is a necessary component of the process. Testing is conducted differently depending on which software model is used. Since the waterfall method follows a sequential approach, the testing is done so also. The flexibility of the agile method also allows flexibility for the testing process.Using the waterfall method testing would begin during the implementation submit. The encounter would be divided into modules and the coding would begin after receiving the system watch over documents. The frequent shopper program would be developed into small programs called units. As an example, there would be a program that handles the input from the customer and another program that would track the employees reward points. Each unit is developed and because tested for functionality. Unit testing verifies if the units meet the specifications.The units are then coordinated into a complete system during the integration phase and tested to see if all units coordinate between each other and the system functions as a whole per the specification (Onestoptesting, 2014). After testing of the frequent shopper program is successful, the software is delivered to the customer. If problems are found after deployment they are solved immediately. This is referred to be maintenance and sometimes that process is virtually never ending.Agile testing focuses on testing being an integral part of software development instead than a separate phase. (Agile Testing, n.d.) Testing from the beginning of the project and continually testing throughout the project lifecycle is the foundation in which agile testing is built. Agile testing is software testing based on the principles of agile software development.The combined team, including the testing team will take responsibility of analyzing the business requirements of the frequent shopper program. Together the team will define a sprint goal. The testing team will then begin work on the test plan that is validated by the wide-cut team and KFF. As the development team starts the implementation , the test team will begin working on the test case design.When the code is ready to test, the test team will do a quick test on the development environment, in order to identify the early stage defects. Developers will fix the defects on a priority basis. This iteration will continue until the end of the code implementation. In addition after approving from KFF, automated test cases will be run on a daily basis. Because of the frequency of testing using the agile method, automated tests are needed.Smith Systems Consulting needs to choose the methodology that works for them and the client. Since each project is unique, there is not a one-size fit all methodology. Two alternative methods for terminate this project were presented and Smith Systems Consulting can make a decision on which to choose.

No comments:

Post a Comment